SIMULASI PERBAIKAN LEAD TIME PROSES PRODUK BUMPER MENGGUNAKAN VALUE STREAM MAPPING DAN PROMODEL DI PT. SUZUKI INDOMOBIL MOTOR

Ismail Kurnia, Dionisius Debata, Prima Fithri

Abstract


The development of the industry in this globalization era is very rapid, causing complex problems. The era of globalization requires all aspects of life to adapt to the development of more advanced times with the sophistication of its technology. One of the ways to increase excellence is to minimize waste in the production line. Beginning by describing the actual condition of the production line and trying to eliminate the waste in order to realize a lean value stream. The method used is a value stream mapping that is useful for seeing the processing time detail so that it knows the value added and non value added as well and Promodel software to simulate the proposed improvement given to improve the process lead time. Based on the current stream map that has been made known waste activities that occur is over process, inventory, and waiting. The front bumper assy panel of the Model Y9J at PT. Suzuki Indomobil Motor is the product with the highest demand for spare parts, where the lead time for stock is 21.2 days, and the lead time for processing is 1.14 days so it is necessary to make improvements using a Value stream mapping simulation, so stock lead time to 6.1 days and process lead time to 0.6 day.

Keywords


Value Stream Mapping, Lean Manufactuirng, Waste, Just in Time, and Promodel

References


Amrina, Uly. 2018. Modul Praktikum Perancangan Lean Manufacturing. Tangerang : Pustaka Mandiri. ISBN 987-602-359-084-1.

Ayu, Fut Tri Budi. 2018. Rekayasa Perbaikan Proses Produksi Boneka dengan Integrasi Metode Line Balancing dan Value Stream Mapping. Operations Excellence Vol.10 No.3. ISSN 2085 – 4293.

Hines, P. and Taylor, D. 2000. Going Lean. Lean Enterprise Research Center Cardiff Business School, USA. ISBN : 978-0814410578.

Gaikwad, M., Shevade, D., dan Krishna, B. P. 2016. Value Stream Mapping: A Case Study of an Assembly Line in an Automotive Industry. International Journal of Current Engineering and Technology. ISSN 2347 – 5161.

Harrell, Charles R., dan Rochelle N. Price. 2003. Simulation Modelling Using Promodel Technology. Proceedings Winter Simulation Conference : USA. ISSN 0-7803-8131-9.

Kakiay, Thomas J.2004. Pengantar Sistem Simulasi. Yogyakarta : Penerbit Andi. ISBN : 979 -731 – 126 – 0.

Kurnia, Ismail. 2011. Implementasi Lean Production System Menggunakan Value Stream Mapping di Line Small Press Stamping. Universitas Indonesia.

Liker, Jeffrey K.2004. The Toyota Way : 14 Prinsip Manajemendari Perusahaan Manufaktur Terhebat di Dunia. Jakarta: Erlangga. ISBN 9780071392310.

Sharma, Deepak, Alok Khatri, dan Dr. Y B Mathur. 2016. Application of Value Stream Mapping in Bhujia Manufacturing. International Journal of Mechanical Engineering and Technology (IJMET) Vol.7, pp 443-448. ISSN 0976-6340.

Sutalaksana, Iftikar Z. Ruhana Anggawisastra., dan Jann H. Tjakraatmadja. 2006. Teknik Perancangan Sistem Kerja. Bandung : Penerbit ITB. ISBN : 979 – 3507 – 90 –x.




DOI: http://dx.doi.org/10.36275/stsp.v22i2.497

Article Metrics

Abstract view : 245 times
PDF (Bahasa Indonesia) - 106 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Ismail Kurnia

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Penerbit : Sekolah Tinggi Teknologi Industri Padang


Alamat:
Jalan Hamka no.121 Tabing Padang. Indonesia
email: info@sttind.ac.id
HP:082386758367