ANALISIS KELAYAKAN INVESTASI PADA KEGIATAN BATUBARA KUD SINAMAR SAKATO DENGAN METODA NPV

Fendri Amir, Tri Gamela Saldy

Abstract


KUD Sinamar Sakato is one of the companies engaged in coal mining using an open pit system. The company has total reserves of 8,431,610 million tonnes. Mining at this company began in January 2021 with a production target of 400,000 tons of coal per year, but only reached 200,000 tons of coal in December 2021. KUD Sinamar Sakato realizes that mining companies require a lot of money, so an investment feasibility analysis is needed to determine whether the mine is economically feasible. , technical and environmental. The method used in this study is to use the Net Present Value. The NPV value in this study is greater than 0 or Rp. 496,473,602,258.14, which means that the project investment is considered feasible or profitable. The PBP value required by the company for return on investment is 2.13 years. The results of this investment feasibility analysis are profitable so that they can become a reference for the company to continue the project.

Keywords


Investment analysis, NPV, PBP

References


A’yun Qurratul. 2019. Analisis Kelayakan Investasi Tambang Batu Andesit Menggunakan Metoda Discounted Cash Flow PT. Ansar Terang Crushindo (ATC) Pangkalan Koto Baru Kabupaten Lima Puluh Kota Sumatera Barat. Skripsi. Sekolah Tinggi Teknologi Industri (STTIND) Padang.

Adisaputra, M Risky. 2013. “Invesment Feasibility Study for Iron Ore Mining Project (Case Study: PT. Ina Touna Mining)”. The Indonesia Journal Of Business Administration. 2(14): 1695-1705.

Arif, H. 2020. Analisis Kelayakan Ekonomi Tambang Batu Andesit PT. Batu Nago Mandiri [di Kecamatan Batang Kapas, Kabupaten Pesisir Selatan, Provinsi Sumatera Barat. Skripsi. Universitas Negeri Padang.

Haryadi, H. 2017. “Financial Feasibility Analysis for Construction Plant of Ferro-Nickel (Fe-Ni) Smelter Plant at South Konawe Regency South East Sulawesi”. Jurnal Pertambangan Indonesia. 20(2): 131-142.

Hazen, Gordon. 2009. An Extension of the Internal Rate of Return to Stochastic Cash Flows. Journal of Management Science. Vol 55. Hal 1030-1034.

Hudaya, Gandi K., Sulistyohadi, F., & Monika, I. 2014. “Economic Feasibility Analyses of Coal Based Activated Carbon Plant In Indonesia”. Indonesian Journal Mining. 17(1): 1-9.

Listiawaty, S. Wahyu. 2018. Investment Analisys Planning Untuk Kelayakan Ekonomi Penambangan Batubara pada Blok A PT. Tebo Agung International. Skripsi. Universitas Negeri Padang.

M. Giatman, 2011. Ekonomi Teknik. Jakarta. Rajawali Pers. Jakarta.

Marin, T., & Veiga. M. 2016. “Economic Feasibility of Responsible Small-Scale Gold Mining”. Journal of Cleaner Production.10:1-6.

Romansyah, D. 2016. Kajian Pengaruh Parameter Ekonomi Terhadap Nilai Sekarang Bersih. Bandung. Universitas Islam Bandung

Pani, F. D., & Saldy, T. G. (2021). Analisis Kelayakan Investasi Pada Pit 2 Nambalau Tambang Batukapur PT. Bakapindo Jorong Durian Kenagarian Kamang Mudiak Kecamatan Kamang Magek Kabupaten Agam Provinsi Sumatera Barat. Bina Tambang, 6(5), 177-183.

Saldy, Tri G. 2012. Studi Keekonomian Jasa Rental Alat Berat pada Kegiatan Pemindahan Over Burden Pit Muara Tiga Besar Selatan PT. Bukit Asam (Persero), Tbk Sumatera Selatan. Skripsi. Universitas Pembangunan Nasional “Veteran” Yogyakarta.

Samosir, Ondo I. 2019. “Analisis Investasi dan Kelayakan Ekonomi pada Kegiatan Penambangan Batubara PT. Pinggan Wahana Pratama Job Site PT. Singlurus Pratama, Kecamatan Samboja, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur”. Jurnal Teknologi Mineral FT UNMUL. 7(1): 39-49.

Sidauruk, Dirga. 2018. Analisis Kelayakan Investasi Menggunakan Metoda Discounted Cash Flow Tambang Galena PT. Triple Eight Energy, Kecamatan Koto Parik Gadang Diateh Kabupaten Solok Selatan Provinsi Sumatera Barat. Skripsi. Universitas Negeri Padang.

Saputra, Hendra. 2016. “Analisis Pemilihan Alternatif Investasi Alat Muat dan Alat Angkut pada Penambangan Batubara di PT. Lamindo Inter Multikon Site Bunyu, Kab. Bulungan, Prov. Kalimantan Utara”. Jurusan Teknik Pertambangan. Skripsi. Universitas Pejuang Republik Indonesia. Makassar.

William, J. Burr. 1938. “The Theory of Investmen Value”. New York

Zakri, R. S., & Saldy, T. G. (2019). Analisis Sensitivitas Deterministik Investasi Pengadaan Alat Berat di Perusahaan Pertambangan Batubara dengan Metode NPV. Bina Tambang, 4(3), 395-405.




DOI: http://dx.doi.org/10.36275/stsp.v22i2.531

Article Metrics

Abstract view : 444 times
PDF (Bahasa Indonesia) - 102 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Fendri Amir, Tri Gamela Saldy

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Penerbit : Sekolah Tinggi Teknologi Industri Padang


Alamat:
Jalan Hamka no.121 Tabing Padang. Indonesia
email: info@sttind.ac.id
HP:082386758367