ANALISIS MODE SISTEM PEMBANGKIT HYBRID BERKELANJUTAN PLTMH-PLN DENGAN SOLAR CELL MENGGUNAKAN HELIOSCOPE DAN HOMER

Sepannur Bandri, Rafika Andari, Liliana Liliana, Rendisky Rendisky

Abstract


This study aims to examine the total cost savings of PLN's electricity bill, which is quite high during the dry season, by using solar panels on a building's roof. The study took place at the PTPN VI Kayu Aro Tea Factory in Kerinci Regency, Jambi Province. Because using renewable energy sources is more complicated than using Microhydro resources, a Hybrid Optimization Model of Electric Renewable (HOMER) application program is required. This application program is used to determine the lowest Initial Cost, Cost Of Energy (COE), and Break Event Point (BEP) over a 25-year period. The Helioscope allows us to identify the required components, which are 164 330 wp solar panels, 2 Surette Rolls 4-Ks25p batteries, and 1 40000TL3-S hybrid inverter. According to the Hybrid Optimization Model of Electric Renewable (HOMER) analysis, the initial cost is IDR 1,049,620,000, the Cost of Energy (COE) is IDR 752/Kwh, and the Break Event Point (BEP) is for 24 years. The simulation results from optimizing the design of the Hybrid microhydro system, PLN with a continuous photovoltaic array show that the contribution of electrical energy produced by PLN is 11,856 kWh/year (16.3%) and solar cells is PV: 61,092 kWh/year (83.7%).

Keywords


Hybrid, HOMER, PLTMH, PLN, Solar Cell

References


Ali Akbar, T. (2018). Analisa Pengaruh Ketinggian Dan Debit Air Terhadap Output Energi Listrik Yang Dihasilkan Pada Pembangkit Mikrohidro (Pltmh) Desa Girikerto. In Tugas Akhir. https://dspace.uii.ac.id/handle/123456789/9792

Anam, M. S., Sunaryantiningsih, I., & Yuniahastuti, I. T. (2022). Analisa Potensi Sumber Daya Air Sebagai Pembangkit Listrik Tenaga Mikro Hidro (Pltmh). ELECTRA : Electrical Engineering Articles, 3(01), 08. https://doi.org/10.25273/electra.v3i01.13485

Anastassopoulos, V., Avignone, F., Bykov, A., Cantatore, G., Cetin, S. A., Derbin, A., Drachnev, I., Djilkibaev, R., Eremin, V., Fischer, H., Gangapshev, A., Gardikiotis, A., Gninenko, S., Golubev, N., Hoffmann, D. H. H., Karuza, M., Kravchuk, L., Libanov, M., Lutovinov, A., … Zioutas, K. (2017). Towards a medium-scale axion helioscope and haloscope. Journal of Instrumentation, 12(11). https://doi.org/10.1088/1748-0221/12/11/P11019.

ESDM. (2020). Peraturan Menteri Energi dan Sumber Daya Mineral RI Tahun 2020.

Hutasuhut, A. A., Rimbawati, Riandra, J., & Irwanto, M. (2022). Analysis of hybrid power plant scheduling system diesel/photovoltaic/microhydro in remote area. Journal of Physics: Conference Series, 2193(1). https://doi.org/10.1088/1742-6596/2193/1/012024

Karuniawan, E. A. (2021). Analisis Perangkat Lunak PVSYST, PVSOL dan HelioScope dalam Simulasi Fixed Tilt Photovoltaic. Jurnal Teknologi Elektro, 12(3), 100. https://doi.org/10.22441/jte.2021.v12i3.001

Kristanto, D., Suyono, H. S. M. P. ., & Ph.D, I. W. M. (2014). Operasi Ekonomis Pembangkit Tenaga Listrik Dengan Metode Iterasi Lambda Menggunakan Komputasi Paralel. Jurnal Mahasiswa TEUB, 2(6), 1–6.

Kurniasih, N., & Nazir, R. (2015). Analisis Mode Sistem Pembangkit Listrik Tenaga Hibrid Microhydro - Photovoltaic Array Menggunakan Homer (Studi Kasus : Kampung Bayang Janiah, Kabupaten Pesisir Selatan). Jurnal Nasional Teknik Elektro, 4(1), 30. https://doi.org/10.25077/jnte.v4n1.114.2015

Kurniawan, A. (2022). Desain Pembangkit Listrik Tenaga Hybrid (Photovoltaic–Mikrohidro) Menuju Desa Mandiri Energi. Jurnal Ilmiah Mahasiswa Teknik [JIMT], 2, 1–10. http://jurnalmahasiswa.umsu.ac.id/index.php/jimt/article/view/1036

Lambert, T. (2006). Micropower system modeling. In John Wiley & Sons, Inc (pp. 379–418).

Meragun, D., Taman, K. N., Sekadau, K., & Wilayah, P. (2013). Analisis Ekonomi Energi Perencanaan Pembangkit Listrik Tenaga Mikrohidro Meragun. 5(1), 31–40.

Muntoha, G. B. (2022). Analisis Potensi Penerapan PLTS pada Kantor Unit Metrologi Legal Dinas Perindustrian dan Perdagangan Kabupaten Tulungagung. Jurnal Listrik Instrumentasi Dan Elektronika Terapan (JuLIET), 3(1), 3–7. https://doi.org/10.22146/juliet.v3i1.73780.

Murni, S. S., & Suryanto, A. (2021). Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro Menggunakan HOMER (Studi Kasus PLTMH Parakandowo Kabupaten Pekalongan). Jurnal Listrik, Instrumentasi Dan Elektronika Terapan (JuLIET), 1(2), 34–38. https://doi.org/10.22146/juliet.v1i2.61282

Nugroho, A. (2015). Daya Terserap Pembangkit Listrik Tenaga Mikro Hydro Karangtalun Yang Digabung Dengan Pt Pln (Persero) Rayon Boja Area Semarang. Transmisi, 17(1), 30–34.

Nur Azizah, A., & Purbawanto, S. (2021). Perencanaan Pembangkit Listrik Tenaga Hibrid (PvDan Mikrohidro) Terhubung Grid. Jurnal Listrik, Instrumentasi Dan Elektronika Terapan, 2(No. 1), 1–1.

Nurmela, N., & Hiron, N. (2019). Optimasi Kinerja Sistem Pembangkit Hybrid. Journal of Energy and Electrical Engineering, 1(1), 7–11. https://doi.org/10.37058/jeee.v1i1.1189

Sukamta, S., Ananta, H., & Aini, M. K. (2018). Studi Analisis Pembangkit Listrik Tenaga Mikrohidro di Kedung Sipingit Desa Kayupuring Kecamatan Petungkriyono Kabupaten Pekalongan. Edu Elektrika Journal, 7(1), 27–33.




DOI: http://dx.doi.org/10.36275/stsp.v22i2.523

Article Metrics

Abstract view : 315 times
PDF (Bahasa Indonesia) - 97 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 rafika andari

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Penerbit : Sekolah Tinggi Teknologi Industri Padang


Alamat:
Jalan Hamka no.121 Tabing Padang. Indonesia
email: info@sttind.ac.id
HP:082386758367