PERBANDINGAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) MESIN PACKER LAMA DAN MESIN PACKER BARU PADA PACKING PLANT INDARUNG (PPI) PT. SEMEN PADANG
Abstract
Key Word : OEE, Packing Plant Indarung, PackerMachine, PT. Semen Padang
Full Text:
PDF (Bahasa Indonesia)References
Ernita, Tri, dkk. Buku Panduan Penulisan dan Ujian Skripsi STTIND Padang, Sekolah Tinggi Teknolgi Industri Padang, Padang, 2012.
Blanchard, B.S, Maintainability: A Key to Effective Serviceability & Maintenance Management, John Willey & Sonc Inc., NewYork, 1995.
Corder Anthony, Teknik Manajemen Pemeliharaan, Erlangga, Jakarta, 1996.
Dkk, Singarimbun, Metoda Penelitian Survey, LP3ES, Jakarta, 2003.
Heizer Jay dan Barry Render, Prinsip-Prinsip Manajemen Operasi, Salemba Empat, Jakarta, 2001.
Nakajima, S, Introduction to Total Productive Maintenance, Productivity Press, Cambridge, 1988
Nazir Moh, Metode Penelitian, Ghalia Indonesia, Jakarta Selatan, 2009.
Pintelon, L.M. and Gelders, L.F. Maintenance Management Decision Making, European Journal of Operation Research 58, 1992.
Sujadi Prawirosentono, Manajemen Operasi Analisis dan Studi Kasus, Bumi Aksara, Jakarta, 2001.
Tampubolon Manahan,Manajemen Operasional, Ghalia Indonesia, Jakarta, 2004.
Wahjudi, Didik, dkk. Studi Kasus Peningkatan Overall Equipment Effectiveness (OEE) Melalui Implementasi Total Preventive Maintenance (TPM), Universitas Kristen Petra, Surabaya, 2009.
Rahman, Arif, dkk. Analisis OverallEquipment Effectiveness (OEE) Dalam Meminimalisi Six Big Losses Pada Mesin Produksi Dual Filters DD07, Universitas Brawijaya, Malang, 2013.
DOI: http://dx.doi.org/10.36275/stsp.v16i2.39
Article Metrics
Abstract view : 355 timesPDF (Bahasa Indonesia) - 355 times
Refbacks
- There are currently no refbacks.
Copyright (c) 2016 Riko Ervil
This work is licensed under a Creative Commons Attribution 4.0 International License.