PERBANDINGAN NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) MESIN PACKER LAMA DAN MESIN PACKER BARU PADA PACKING PLANT INDARUNG (PPI) PT. SEMEN PADANG

Riko Ervil

Abstract


Packing Plant Indarung PT. Semen Padang which located at Jl. Raya Indarung - Padang has an important role to packing the cements. There are two types packer machines on Packing Plant Indarung, it is old packer machine and new packer machine. The objective of this study was to determine the effectiveness comparative of both packer machine types. One of method to measuring effectiveness machine is Overall Equipment Effectiveness (OEE). OEE is composed of three factors, that is Availability, Performance, and Quality. OEE score obtained by multiplying these factors.Result of the research show that Overall Equipment Effectiveness value of the new packer machines is higher than old packer machines. OEE score of the new packer machines is 69,14%. While OEE score of the old packer machines is 76,80%. Therefore, it was concluded that the effectiveness of new packer machine is better than old packer machine.

Key Word : OEE, Packing Plant Indarung, PackerMachine, PT. Semen Padang


References


Ernita, Tri, dkk. Buku Panduan Penulisan dan Ujian Skripsi STTIND Padang, Sekolah Tinggi Teknolgi Industri Padang, Padang, 2012.

Blanchard, B.S, Maintainability: A Key to Effective Serviceability & Maintenance Management, John Willey & Sonc Inc., NewYork, 1995.

Corder Anthony, Teknik Manajemen Pemeliharaan, Erlangga, Jakarta, 1996.

Dkk, Singarimbun, Metoda Penelitian Survey, LP3ES, Jakarta, 2003.

Heizer Jay dan Barry Render, Prinsip-Prinsip Manajemen Operasi, Salemba Empat, Jakarta, 2001.

Nakajima, S, Introduction to Total Productive Maintenance, Productivity Press, Cambridge, 1988

Nazir Moh, Metode Penelitian, Ghalia Indonesia, Jakarta Selatan, 2009.

Pintelon, L.M. and Gelders, L.F. Maintenance Management Decision Making, European Journal of Operation Research 58, 1992.

Sujadi Prawirosentono, Manajemen Operasi Analisis dan Studi Kasus, Bumi Aksara, Jakarta, 2001.

Tampubolon Manahan,Manajemen Operasional, Ghalia Indonesia, Jakarta, 2004.

Wahjudi, Didik, dkk. Studi Kasus Peningkatan Overall Equipment Effectiveness (OEE) Melalui Implementasi Total Preventive Maintenance (TPM), Universitas Kristen Petra, Surabaya, 2009.

Rahman, Arif, dkk. Analisis OverallEquipment Effectiveness (OEE) Dalam Meminimalisi Six Big Losses Pada Mesin Produksi Dual Filters DD07, Universitas Brawijaya, Malang, 2013.




DOI: http://dx.doi.org/10.36275/stsp.v16i2.39

Article Metrics

Abstract view : 359 times
PDF (Bahasa Indonesia) - 358 times

Refbacks

  • There are currently no refbacks.


Copyright (c) 2016 Riko Ervil

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Penerbit : Sekolah Tinggi Teknologi Industri Padang


Alamat:
Jalan Hamka no.121 Tabing Padang. Indonesia
email: info@sttind.ac.id
HP:082386758367